What is in an extension kit, and what is not
Flat pack, self build and DIY extension kits are the same product under three names: the structural shell, made off site and delivered in pieces. What suppliers count as "the shell" varies more than the adverts suggest. This page sets out what you can expect, what to ask about and what is never included.
In the kit
- Walls: panels or frames, cut and numbered
- Roof structure: joists, rafters or roof panels
- Sole plates
- Structural fixings
- Calculations for the frame
- Assembly drawings
- Delivery to the kerb
Not in the kit
- Foundations and the floor slab
- The opening into the house
- Drains and manholes
- Electrics, heating and plumbing
- Plaster, flooring and decoration
- Planning and building control fees
- Scaffolding, skips and plant hire
The grey area: ask about each of these
Between what is always in and what is never in sits a list that changes from one supplier to the next. Two quotes thousands of pounds apart can turn out to be the same price once these are lined up.
| Item | How often it is included | What to ask |
|---|---|---|
| Insulation | In SIPs by definition. Often left out of open timber panels | The thickness and type needed to reach 0.18 W/m²K |
| Windows and doors | Sometimes, as an extra | Whether openings are sized for standard frames |
| Roof covering | Rarely. The deck is included, the membrane is not | What the deck is rated to carry, and the fall built into it |
| Roof lantern or rooflights | Sometimes | Whether the opening and its trimmers are in the frame price |
| Cladding and battens | Sometimes | Whether the fixings and cavity barriers are included |
| Internal lining | Rarely | Which vapour control layer the wall design relies on |
| Putting it up | Offered by most suppliers at extra cost | The day rate or fixed price, and what the crew needs on site |
What is never in the box
The ground. Footings, the slab and any drains under it are built on site by you or a groundworker, to a drawing the kit supplier does not produce. The supplier will tell you the loads; a structural engineer or building control settles the footing.
The hole in the house. Joining the new room to the old means taking out part of the back wall and holding up what is above it with a steel beam. That beam needs its own calculation, temporary props and a builder who has done it before. It is the riskiest part of the job and no kit touches it.
Approvals. The supplier's calculations support your building regulations application but do not replace it. You or your designer apply, pay the fee and book the inspections. If the extension needs planning permission, that is yours to obtain as well.
Everything that makes it a room. Wiring, heating, plaster, floor finishes, a kitchen if there is one.
Nine questions that make quotes comparable
- Is delivery in the price, and to where: kerb, driveway or back garden?
- Does the lorry unload itself, or do I need people or a machine?
- What is the wall thickness, outside face to inside face, once finished?
- What U-value does that wall reach, and is the insulation in the price?
- Do the calculations cover the whole frame, including fixing it down and bracing it?
- How level and square does my base need to be?
- How long from deposit to delivery, and how much notice do I get of the date?
- What are the payment stages, and how is my deposit protected?
- If a part is missing or wrong, how quickly is it replaced and who pays?
Put the answers side by side. The cheapest kit is quite often the one with the most left out.
The order things happen in
Drawings and approvals come first, because the kit is made from the approved drawings and cannot be changed cheaply afterwards. The base goes in while the kit is being made. The kit is delivered, usually on one lorry, and the shell goes up. Then the roof is covered and the windows fitted, which makes the room weathertight. Only after that is the wall of the house opened, so the house is never exposed. First fix, plaster, second fix and floors follow, and building control signs the work off at the end.
How much of the job the kit is
By cost, a bit under half. National guides put kits at £1,000 to £1,400 per m² of floor and finished timber frame or SIPs extensions at £2,200 to £3,000 per m². The kit price guide shows the split for your floor area.
Where our information comes from
- GOV.UK: Building regulations approval
- GOV.UK: Approved Document L, conservation of fuel and power
- GOV.UK: Approved Document A, structure
- GOV.UK: Planning permission in England and Wales
- GOV.UK: Permitted development rights for householders, technical guidance
Rules quoted are for England unless we say otherwise. Wales follows closely; Scotland and Northern Ireland have their own building standards.
What is in a kit: common questions
Are flat pack extension kits and self build extension kits different things?
No. Both names describe a structural shell made off site and delivered in pieces for assembly. "Self build" stresses who puts it up; "flat pack" stresses how it arrives. Suppliers use them interchangeably.
Do extension kits come with instructions?
They come with assembly drawings: a plan showing where each numbered panel goes, and details for the joints. They assume you can read a construction drawing. If you cannot, pay for the supplier's crew or a carpenter for the frame stage.
Is the kit supplier responsible if the extension fails building control?
Only for what they supplied. If the frame is not as calculated, that is theirs to put right. If the footing is too shallow or the insulation you bought is too thin, that is yours. This is why the split of who supplies what should be written into the order.
Can I buy a kit before I have approval?
You can, but do not. If planning or building control asks for a change, a kit already made to the old drawing may be scrap. Order once the drawings are approved.
Get a quote for your kit
A postcode, four short questions about the kit, then your phone and email. Most people finish in under a minute.
Extension Kits is a free introduction service, not a kit maker. We find a kit supplier that covers your area and send you its name first. Nothing is passed on until you say yes.
Thank you. Your request has reached us.
- We look for a kit supplier that delivers to your postcode and makes the system you chose.
- Within one working day we email or phone you with that supplier's name.
- If you are happy with them, we hand over your request and they price the kit. If not, nothing is passed on.